WEISS REAL ESTATE • NOVEMBER 2026 • 2027 OUTLOOK
Sydney’s apartment defects crisis: what buyers and owners need to know
By Alan Weiss | Sydney Eastern Suburbs real estate agent
A beautiful apartment can conceal a very expensive building. Before buying the view, understand the liabilities you are buying into.
Conceptual illustration — not a diagnosis of any particular building.
Why this matters in Sydney’s east
In my experience, buyers often focus on the apartment itself while overlooking the owners corporation. Across the Bondi Junction property market, the quality of common property, insurance and capital works can be just as important as the floor plan. Density is necessary, but more apartments do not automatically mean better housing. I would rather buy a well-managed older building than a new apartment with unresolved defects.
1. Construction economics: when margins disappear
Fixed-price contracts expose builders to material and labour escalation. Rework, delays and financing costs can exhaust a thin margin. That creates pressure to cut costs, but it does not establish that any particular builder deliberately compromised safety. Waterproofing, fire separation and reinforcement require documented inspections before concealment.
Interactive builder margin stress test
Illustrative $40 million fixed-price contract, $38 million initial cost.
Initial profit $2m; 5% cost increase consumes $1.9m. At 10%, loss is $1.8m. Excludes contract variations and recoveries.
Insolvency can leave owners chasing an entity with few assets. A special purpose vehicle is not inherently improper, but buyers should identify the actual contracting entities, guarantees and insurance. For broader context, see my Sydney property market analysis.
2. The lessons from Sydney’s building failures
Opal Tower — 2018
Evacuations followed cracking in the Sydney Olympic Park tower. The NSW Government investigation identified design and construction shortcomings involving hob beams and connections, including incomplete grouting. The lesson is that engineering design and execution must both be independently checked.
Mascot Towers — 2019
Residents were evacuated after structural cracking was identified. Owners faced years of uncertainty, mortgage payments and remediation funding pressures. A 2024 resolution involved a sale arrangement and financial assistance. The lesson is that a defect can become a household financial crisis long after settlement.
Other regulatory examples
The supplied report also discusses 93 Auburn Road, Skyview in Castle Hill, Vicinity in Canterbury and Otto 2 in Rosebery. These illustrate the need to examine actual regulatory orders, engineering findings and corporate solvency. I have not reproduced unverified allegations against individuals or asserted current remediation outcomes. An historical order does not establish a building’s present condition.
3. What the NSW defect surveys actually show
2025 surveyed buildings with serious defects
Waterproofing defects
Fire safety defects
Explore the survey results
Source: Building Commission NSW, 2021, 2023 and 2025 strata defects research. Different survey cohorts; not a census or a probability for every apartment. Categories may overlap.
The 2025 survey received 520 responses covering eligible class 2 schemes of four storeys and above registered July 2018–June 2024. Newer registered buildings showed lower defect rates than older cohorts. The 2021 study estimated average owners corporation expenditure of approximately $332,000 to rectify serious defects; that is historical, not a current repair quote. A low proportion of court-ordered resolutions does not mean litigation has a 3% success rate.
4. Certification, warranties and NSW reforms
An occupation certificate is an important statutory approval, not a guarantee that every concealed component is defect-free. Private certifiers must comply with independence and conflict-of-interest rules under the Building and Development Certifiers Act 2018. The Shergold Weir Building Confidence report identified weaknesses in documentation and oversight. The Design and Building Practitioners Act 2020 adds regulated design and compliance obligations for covered work and a statutory duty of care.
| Protection | What it means |
|---|---|
| Home Building Act warranties | Generally six years for major defects, two years for other defects from completion; strict deadlines and possible limited extension. |
| RAB Act 2020 | Regulatory powers including rectification and prohibition orders, potentially up to ten years after completion. Not a ten-year warranty. |
| Project Intervene | New registrations closed; existing undertakings continue. Owners corporations can lodge building complaints with Building Commission NSW. |
| Strata building bond | Generally 2% of contract price for eligible projects; increase to 3% deferred to 1 July 2028. Not comprehensive insurance. |
| Decennial / latent defects insurance | Potential ten-year cover subject to policy terms, exclusions and eligibility. Not universal mandatory protection; NSW no longer accepts policies purchased after 24 October 2024 as substitutes under its stated bond arrangements. |
| iCIRT | Voluntary independent industry rating; useful additional evidence, not a guarantee or substitute for inspection. |
Do not delay legal advice while pursuing a regulator complaint. Different causes of action and limitation periods may apply. Building Commission NSW guidance and the applicable legislation should be checked for the specific project.
5. What could a special levy cost you?
When common property needs repair, the owners corporation generally has a duty to maintain and repair it. Funding may come from available reserves, recoveries, special levies or borrowing. Contributions generally follow unit entitlements, not equal apartment counts. The following model is hypothetical.
Funding shortfall: $3,000,000
Your estimated share: $30,000
Monthly loan contribution: $637
Total interest on your share: $8,245
Funding comparison
Fully amortising monthly loan, fixed illustrative rate, no fees. Actual strata loan terms and levy resolutions vary. No assumption of recoveries unless confirmed.
For a $1.2m apartment, a $30,000 levy is 2.5% of the purchase price. A separate 5% market decline is $60,000; together the exposure is $90,000 before financing costs. This is a scenario, not a valuation discount or forecast. Read my buying property in Sydney guidance before committing.
6. My apartment buyer’s due diligence checklist
Inspect the records as well as the apartment. A strata report is a starting point, not an engineering assessment.
| Check | What to request |
|---|---|
| Finances | Capital works plan, current balances, arrears, approved levies, loans and actual tender costs. |
| Waterproofing | Leak history, membrane reports, balcony drainage and completed rectification evidence. |
| Structure and facade | Engineer reports, crack monitoring, cladding assessments and any regulatory orders. |
| Fire safety | Annual fire safety statement, outstanding defects and maintenance records. NSW AS 1851-2012 requirements commenced 13 February 2026 for covered buildings, subject to performance solutions. |
| Legal and insurance | Claims, litigation, policy exclusions, excesses, warranties, builder/developer status. |
| Governance | Meeting minutes, maintenance contracts, repair decisions and independent progress certification. |
Cracks, dampness, efflorescence, sticking doors and facade distortion warrant investigation; none alone proves structural failure. Flat balcony thresholds and louvred windows can be compliant when properly designed. Obtain independent engineering advice rather than relying on a visual rule of thumb.
When comparing Bondi Junction apartment prices, account for building-specific liabilities, not just the suburb median.
My view: quality is part of value
We need more housing, but we also need buildings that remain safe, insurable and financially sustainable. Digital as-built records, independent inspections and better construction quality controls can help. Off-site manufacturing may improve consistency, but it is not a substitute for accountability.
Whether you are buying or selling property in Sydney, understand the building before deciding what the apartment is worth.
Research and limitations
Sources: Building Commission NSW, Strata Defects Research Reports 2021, 2023 and 2025; Project Intervene; Strata Building Bond and Inspections Scheme; NSW Government building dispute and intervention guidance; Shergold Weir Building Confidence (2018); NSW Government Opal Tower investigation. Regulatory information reviewed November 2026. General information only, not engineering, legal or financial advice.